Location of Project | Kipling, Saskatchewan, Canada |
Project Complete Year | June 2024 |
Project Scope |
A 200MW wind facility, Bekevar Wind Farm consists of 36 wind turbines and underground medium-voltage collector system. It matches the province’s other largest wind generation facility. |
Rising Edge’s Scope of Work |
Rising Edge was responsible for the engineering, procurement, construction of the Bekevar-Yotin 230/34.5kV substation as well as installation of the corresponding collection network system – installation, termination, and commissioning of 34.5kV power cables, continuous ground, and fiber optic. |
Voltage | 230kV |