Bekevar Wind Substation and Collector

Location of Project  Kipling, Saskatchewan, Canada Project Complete Year  June 2024 Project Scope A 200MW wind facility, Bekevar Wind Farm consists of 36 wind turbines and underground medium-voltage collector system.…
Location of Project  Kipling, Saskatchewan, Canada
Project Complete Year  June 2024
Project Scope

A 200MW wind facility, Bekevar Wind Farm consists of 36 wind turbines and underground medium-voltage collector system. It matches the province’s other largest wind generation facility. 

Rising Edge’s Scope of Work

Rising Edge was responsible for the engineering, procurement, construction of the Bekevar-Yotin 230/34.5kV substation as well as installation of the corresponding collection network system – installation, termination, and commissioning of 34.5kV power cables, continuous ground, and fiber optic. 

Voltage 230kV 
Service / Tags
  • Renewable Energy
  • Substation
  • EPC
  • Engineering
  • Procurement
  • Construction
  • Commissioning