Location of Project | Edson, Alberta, Canada |
Project Complete Year | March 2022 |
Project Scope |
A proposed 900MW combined cycle natural gas-fired generating facility was to be developed and the utility, in order to connect the generating plant to the transmission system, three (3) new transmission lines were added connecting the facility’s owner substation and local utility’s substation. |
Rising Edge’s Scope of Work |
Rising Edge was responsible for the engineering, procurement, construction, and commissioning of various substation expansions and fortifications at five (5) different substations within the area. More specifically, the scope of work include, but was not limited to, substation expansion, new concrete foundations and screw piles, complete grounding, installation of new bus, equipment structures, 240kV equipment, and various P&C and SCADA panels and relays. |
Voltage | 240kV |
Service / Tags |
|
Cascade Combined Cycle
Location of Project Edson, Alberta, Canada Project Complete Year March 2022 Project Scope A proposed 900MW combined cycle natural gas-fired generating facility was to be developed and the utility, in…