Location of Project | Jenner, Alberta, Canada |
Project Complete Year | Q2 2023 |
Project Scope |
This wind generation facility would generate 290MW of energy and was developed in the following three (3) phases. All 3 phases shared the same interconnection infrastructure including 240kV transmission line and a 240/34.5kV substation.
|
Rising Edge’s Scope of Work |
Rising Edge was responsible for the engineering, procurement, construction, and commissioning of 240/34.5kV collector substation and 100km (62 miles) of 34.5kV underground collector line network system, and 12km (7.5 miles) of 240kV transmission line. |
Voltage | 240kV |
Service / Tags |
|
Jenner Wind Substation and Collector