Pome BESS Facility

Location of Project  Poway, California, USA Project Complete Year  April 2025 Project Scope POME’s Battery Energy Storage Systems (BESS) is a stand-alone BESS project with a capacity of 100MW/400MWh. This…
Location of Project  Poway, California, USA
Project Complete Year  April 2025
Project Scope POME’s Battery Energy Storage Systems (BESS) is a stand-alone BESS project with a capacity of 100MW/400MWh. This project is aimed at supporting the power system with capacity, grid stability, balancing supply and demand, preventing blackouts and reducing grid strain.
Rising Edge’s Scope of Work Rising Edge is responsible for the installation of critical infrastructure for the Battery Energy Storage System (BESS). The scope included supplying and installing BESS yard surface rock, excavation, and subgrade preparation for precast concrete foundations for both BESS and transformers. Work also involved below-grade grounding, installation of conduit and cable raceways, and receiving and installing twenty-eight (28) MV GSU Padmount Transformers and one hundred twelve (112) Tesla MegaPacks. Additionally, Rising Edge installed all conduit, MV AC power cables, lighting power cables, and fiber cables while providing complete electrical testing and energization support for the new BESS system.
Voltage 28MW
Service / Tags
  • BESS
  • Renewable Energy
  • Construction
  • Procurement
  • Commissioning 

Related Posts

No results found.