Sierra BESS

Location of Project  Churchill County, Nevada, USA Project Complete Year  Q4 2025 Project Scope A 400MW, 4hr (1.6GWH) Battery Energy Storage System (BESS) project that is designed to store the…
Location of Project  Churchill County, Nevada, USA
Project Complete Year  Q4 2025
Project Scope

A 400MW, 4hr (1.6GWH) Battery Energy Storage System (BESS) project that is designed to store the increased renewable energy generation to meet state portfolio standards.  

Rising Edge’s Scope of Work

Rising Edge was responsible for the construction of BESS containing 456 Tesla 2XL Megapacks. This included the yard fencing, megapack foundation and testing, MVT foundation installation and testing, underground conduit, low-voltage cabling, and site ground grid. 

Voltage 345kV 
Service / Tags
  • Utility
  • Construction
  • BESS 