| Location of Project | Lethbridge, Alberta, Canada | 
| Project Complete Year | November 2024 | 
| Project Scope | Local utility required an upgrade to an existing substation with two (2) separate scopes where transformer replacement would be required and the protection upgrade of an incoming line. | 
| Rising Edge’s Scope of Work | Rising Edge was responsible for executing two (2) scopes: 
 | 
| Voltage | 138kV | 
| Service / Tags | 
 | 
T1 Transformer and Protection Upgrades
Location of Project  Lethbridge, Alberta, Canada Project Complete Year  November 2024 Project Scope Local utility required an upgrade to an existing substation with two (2) separate scopes where transformer replacement…