Location of Project | Across 8 Sites in Texas, USA |
Project Complete Year | February 2025 |
Project Scope | To support Eight (8) BESS projects under construction, our client needed to supply and deliver prefabricated control buildings for each project. With specific design and specifications, each building required to be outfitted with Protection & Control (P&C) and SCADA panels to support operational monitoring and management of the facility. The buildings were deployed to eight Battery Energy Storage System (BESS) facilities across Texas, including locations in Fort Stockton, Seguin, West Columbia, Sweeny, Texas City, Del Rio, and Corpus Christi. |
Rising Edge’s Scope of Work | Rising Edge was responsible for the supply and delivery of eight (8) prefabricated controls buildings (14’x40’ in size). The buildings were outfitted with five (5) populated and wired P&C panels and one (1) SCADA panel – that were design, constructed, and testing by Rising Edge’s Panel Shop facility. More specifically:
All substation control enclosures and relays were delivered to all eight (8) Battery Energy Storage System (BESS) facilities. |
Voltage | N/A |
Service / Tags |
|
TGR 2.0 Substation Control Enclosure & Relay Panels
Location of Project Across 8 Sites in Texas, USA Project Complete Year February 2025 Project Scope To support Eight (8) BESS projects under construction, our client needed to supply and…