Wheatland Substation and Collector

Location of Project  Drumbheller, Alberta, Canada Project Complete Year  Q2 2022 Project Scope This wind generation facility consists of approximately 120MW generating capacity by installing up to twenty-four (24) wind…
Location of Project  Drumbheller, Alberta, Canada
Project Complete Year  Q2 2022
Project Scope

This wind generation facility consists of approximately 120MW generating capacity by installing up to twenty-four (24) wind turbines, an underground electrical collection system, access roads, and construction of new wind collector system. Turbines will be connected through a combination of 34.5kV above ground and underground collector lines connecting to the newly constructed project substation. 

Rising Edge’s Scope of Work

Rising Edge was responsible for the engineering, procurement, construction, and commissioning of 144/34.5kV collector substation and 40km (24.85 miles) of underground and overhead 34.5kV collector line system. 

Voltage 144kV 
Service / Tags
  • Renewable Energy
  • Substation
  • Engineering
  • Procurement
  • Construction
  • Commissioning