Location of Project | Drumbheller, Alberta, Canada |
Project Complete Year | Q2 2022 |
Project Scope |
This wind generation facility consists of approximately 120MW generating capacity by installing up to twenty-four (24) wind turbines, an underground electrical collection system, access roads, and construction of new wind collector system. Turbines will be connected through a combination of 34.5kV above ground and underground collector lines connecting to the newly constructed project substation. |
Rising Edge’s Scope of Work |
Rising Edge was responsible for the engineering, procurement, construction, and commissioning of 144/34.5kV collector substation and 40km (24.85 miles) of underground and overhead 34.5kV collector line system. |
Voltage | 144kV |
Service / Tags |
|
Wheatland Substation and Collector