Parmele Solar Farm
Location: Martin County, NC, USA
Date of completion: 2019
Customer: Reach Construction Group
Size: 13.572 MWDC / 10.000 MWAC
Scope: Construction and Commissioning
This Solar Farm was built across 65 acres of land in Martin County, North Carolina. Rising Edge was responsible for the full electrical installation from the DC strings to the point of interconnect. Electrical included all DC, AC, and MV/interconnection.