Winnifred Wind Farm Substation and Collector System

Location of Project Whitla, Alberta, Canada Project Complete Year  2024 Project Scope The Winnifred Wind Farm is a 136.4MW wind energy facility and includes a total of twenty-two (22) wind…
Location of Project Whitla, Alberta, Canada
Project Complete Year  2024
Project Scope The Winnifred Wind Farm is a 136.4MW wind energy facility and includes a total of twenty-two (22) wind turbine generators (WTGs). Additionally, project will include an electrical collection system, access roads, and the construction of a new wind collector substation (“Holsom”). The turbines in the Project will be connected through a combination of 34.5 kilovolt (kV) above ground and underground collector lines that connect at the proposed Holsum 1054s Substation. The Project will also require a temporary laydown area during construction and an operation and maintenance building during the operation of the Project.
Rising Edge’s Scope of Work Rising Edge is responsible for the EPC of 138/34.5kV collector substation and 44km of 34.5kV underground collector system.
Voltage 138/34.5kV
Service / Tags
  • EPC
  • Engineering
  • Procurement
  • Construction 
  • Commissioning 
  • Substation
  • Renewable Energy

Related Posts