Grizzly Bear Wind Substation and Collector

Location of Project  Edson, Alberta, Canada Project Complete Year  Q2 2023 Project Scope This project involved the generation facility of 154MW by constructing of up to thirty-six (36) 5.7MW wind…
Location of Project  Edson, Alberta, Canada
Project Complete Year  Q2 2023
Project Scope

This project involved the generation facility of 154MW by constructing of up to thirty-six (36) 5.7MW wind turbines, an electrical collection system, access roads, three (3) permanent meteorological towers and a substation. 

Rising Edge’s Scope of Work

Rising Edge was responsible for the engineering, procurement, construction, and commissioning of 138/34.5kV collector substation and installation of 63km (2.5miles) of underground 34.5kV collector line system. 

Voltage 138kV 
Service / Tags
  • Renewable Energy
  • Substation
  • Engineering
  • Procurement
  • Construction
  • Commissioning