Location of Project | Edson, Alberta, Canada |
Project Complete Year | Q2 2023 |
Project Scope |
This project involved the generation facility of 154MW by constructing of up to thirty-six (36) 5.7MW wind turbines, an electrical collection system, access roads, three (3) permanent meteorological towers and a substation. |
Rising Edge’s Scope of Work |
Rising Edge was responsible for the engineering, procurement, construction, and commissioning of 138/34.5kV collector substation and installation of 63km (2.5miles) of underground 34.5kV collector line system. |
Voltage | 138kV |
Service / Tags |
|
Grizzly Bear Wind Substation and Collector