| Location of Project | Stirling, Alberta, Canada |
| Project Complete Year | 2023 |
| Client | Potentia Renewables |
| Project Scope | Stirling Wind Farm is a 120.4MW wind energy facility and includes a total of twenty-three (23) wind turbine generators (WTGs). Additionally, the facility includes an electrical collection system, access roads, and the construction of a new wind collector substation (“Red Coat”). The turbines are connected through a combination of 34.5 kilovolt (kV) above ground and underground collector lines that connect to the new Red Coat Substation. |
| Rising Edge’s Scope of Work | Engineering, procurement, construction (EPC) of 138/34.5kV collector substation and 40km of 34.5kV underground collector system. |
| Transmission Facility Operator | AltaLink Management LP |
| System Operator | Alberta Electric System Operator (AESO) |
| Voltage | 138/34.5kV |
| Service / Tags |
|
Stirling Wind Farm Substation and Collector
Location of Project Stirling, Alberta, Canada Project Complete Year 2023 Client Potentia Renewables Project Scope Stirling Wind Farm is a 120.4MW wind energy facility and includes a total of twenty-three…