| Location of Project | Kipling, Saskatchewan, Canada |
| Project Complete Year | 2024 |
| Client | Renewable Energy Systems (RES) |
| Project Scope | Bekevar Wind L.P., a partnership between Renewable Energy Systems Canada Inc. (RES) and Awasis Nehiyawewini Energy Development Limited Partnership (ANEDLP), a wholly owned Cowessess First Nation entity, developed, constructed and is operating a net 200MW wind power project south and southeast of Kipling, Saskatchewan. The project comprised 36 turbines including access roads, an underground medium-voltage collector system, a substation, operations and maintenance building, and a temporary laydown area. |
| Rising Edge’s Scope of Work | Engineering, procurement, construction (EPC) of a 240/34.5kV wind farm collector substation and approximately 106km of underground 34.5kV collector network connecting 36 wind turbines to the substation, including MV power cable, fiber-optic and grounding infrastructure, splicing, terminations, testing and commissioning. |
| Transmission Facility Operator | SaskPower Corporation |
| System Operator | SaskPower Corporation |
| Voltage | 240/34.5kV |
| Service / Tags |
|
Bekevar Wind Substation and Collector
Location of Project Kipling, Saskatchewan, Canada Project Complete Year 2024 Client Renewable Energy Systems (RES) Project Scope Bekevar Wind L.P., a partnership between Renewable Energy Systems Canada Inc. (RES) and Awasis Nehiyawewini Energy Development Limited…