| Location of Project | Poway, California, USA |
| Project Complete Year | 2025 |
| Client Name | GridWorks Energy |
| Project Scope | This stand-alone BESS project has a capacity of 100MW/400MWh. It aims at supporting the power system with capacity, grid stability, balancing supply and demand, preventing blackouts and reducing grid strain. |
| Rising Edge’s Scope of Work | Executed the installation of critical infrastructure for the Battery Energy Storage System (BESS). The scope included supplying and installing BESS yard surface rock, excavation, and subgrade preparation for precast concrete foundations for both BESS and transformers. Work also involved below-grade grounding, installation of conduit and cable raceways, and receiving and installing twenty-eight (28) MV GSU Padmount Transformers and one hundred twelve (112) Tesla MegaPacks. Additionally, Rising Edge installed all conduit, MV AC power cables, lighting power cables, and fiber cables while providing complete electrical testing and energization support for the new BESS system. |
| Technology | Telsa Megapacks |
| Capacity | 100MW / 400MWh |
| Service / Tags |
|
POME BESS
Location of Project Poway, California, USA Project Complete Year 2025 Client Name GridWorks Energy Project Scope This stand-alone BESS project has a capacity of 100MW/400MWh. It aims at supporting the…