Forty Mile Wind Farm Substation

Location of Project  Bow Island, Alberta, Canada Project Complete Year  2024 Client Renewable Energy Systems (RES) Project Scope Forty Mile Wind Farm is the development and construction of a utility-scale wind generation…
Location of Project  Bow Island, Alberta, Canada
Project Complete Year  2024
Client Renewable Energy Systems (RES)
Project Scope Forty Mile Wind Farm is the development and construction of a utility-scale wind generation facility near Bow Island. Phase I comprises 49 wind turbines with approximately 280MW of generating capacity, with broader development incorporating an additional 120MW in Phase II. The project incorporates collector and grid-interconnection infrastructure, connecting the wind generation facility to Alberta’s transmission system. 
Rising Edge’s Scope of Work Engineering, procurement, and construction (EPC) of a 240/34.5kV Collector Substation (Forty Mile 516S Substation) and connecting it to AltaLink’s Murray Lake 326S Substation. 
Transmission Facility Operator AltaLink Management LP
System Operator Alberta Electric System Operator (AESO)
Voltage 240/34.5kV