| Location of Project | Drumheller, Alberta, Canada |
| Project Complete Year | 2024 |
| Client | Neoen |
| Project Scope | Fox Coulée Solar Farm is a 93MW solar photovoltaic facility, the first solar project and first operating asset in Canada for Neoen. Connecting to ATCO Electric’s system, the project supports Alberta’s goal of carbon neutrality by 2035 – reducing 70,000 tonnes of CO2 emissions yearly while powering 20,000 homes. |
| Rising Edge’s Scope of Work | Engineering, procurement and construction (EPC) of the utility interconnection for the 93 MWp Fox Coulée Solar Farm, connecting the facility to ATCO Electric’s distribution system through three (3) 25kV distribution feeders. |
| Transmission Facility Operator | ATCO Electric Ltd. |
| System Operator | Alberta Electric System Operator (AESO) |
| Voltage | 25kV |
| Service / Tags |
|
Fox Coulée Solar Farm Substation
Location of Project Drumheller, Alberta, Canada Project Complete Year 2024 Client Neoen Project Scope Fox Coulée Solar Farm is a 93MW solar photovoltaic facility, the first solar project and first operating asset in Canada for Neoen.…