| Location of Project | Assiniboia, Saskatchewan, Canada |
| Project Complete Year | 2020 |
| Client | Potentia Renewables |
| Project Scope | Golden South Wind Facility is a 200MW wind facility comprising 50 Goldwind 4.2MW wind turbines. The project contains a 240kV collector substation which facilitates SaskPower’s transmission interconnection. |
| Rising Edge’s Scope of Work | Engineering, procurement, construction (EPC) of 240/34.5 kV collector substation, including 34.5kV GIS switchgear, supporting the wind facility interconnection with SaskPower’s transmission network. |
| Transmission Facility Operator | SaskPower Corporation |
| System Operator | SaskPower Corporation |
| Voltage | 240/34.5kV |
| Service / Tags |
|
Golden South Wind Farm Substation
Location of Project Assiniboia, Saskatchewan, Canada Project Complete Year 2020 Client Potentia Renewables Project Scope Golden South Wind Facility is a 200MW wind facility comprising 50 Goldwind 4.2MW wind turbines. The project contains a 240kV collector substation which facilitates SaskPower’s transmission…