Grizzly Bear Wind Substation and Collector

Location of Project  Minburn & Vermillion, Alberta, Canada Project Complete Year  2023 Client ENEL Green Power Project Scope Grizzly Bear Creek Wind Farm is approximately 170km east of Edmonton, and is a…
Location of Project  Minburn & Vermillion, Alberta, Canada
Project Complete Year  2023
Client ENEL Green Power
Project Scope Grizzly Bear Creek Wind Farm is approximately 170km east of Edmonton, and is a 152MW wind generation facility comprising 34 wind turbines. Facility includes an electrical collection system, access roads, 3 permanent meteorological towers, and a substation. 
Rising Edge’s Scope of Work Engineering, procurement, construction (EPC) of 138/34.5kV collector substation and installation of 63km of underground 34.5kV collector line system support the wind-generation facility.
Transmission Facility Operator ATCO Electric Ltd.
System Operator Alberta Electric System Operator (AESO)
Voltage 138/34.5kV 
Service / Tags
  • Renewable Energy
  • Substation
  • EPC
  • Collector System
  • Control Building Fabrication