| Location of Project | Jenner, Alberta, Canada |
| Project Complete Year | 2023 |
| Client | Potentia Renewables |
| Project Scope | Developed near Jenner, Alberta, the Jenner Wind Farm project comprises 3 wind facilities totaling 303MW with 55 wind turbines. Development of this facility were broken up into 3 phases:
Jenner Wind Farm 1 – is a 122.4MW generation facility consisting of 22 Enercon 5.5MW turbines, an underground collector line system, new turbine access roads, and road upgrades. Jenner Wind Farm 2 – is a 71.4MW generation facility consisting of 13 Enercon 5.5 MW turbines, an underground collector line system, new turbine access roads, and road upgrades. Jenner Wind Farm 3 – is a 109.2MW generation facility consisting of 20 Enercon 5.5 MW turbines, an underground collector line system, new turbine access roads, and road upgrades. All 3 projects share the same interconnection infrastructure connecting the facility to Alberta’s electricity grid. |
| Rising Edge’s Scope of Work | Engineering, procurement, construction (EPC) of 240/34.5kV collector substation, 100km of 34.5kV underground collector line network system, and 12km of 240kV transmission line supporting the interconnection of all 3 facilities. |
| Transmission Facility Operator | AltaLink Management LP |
| System Operator | Alberta Electric System Operator (AESO) |
| Voltage | 240/34.5kV |
| Service / Tags |
|
Jenner Wind Substation and Collector
Location of Project Jenner, Alberta, Canada Project Complete Year 2023 Client Potentia Renewables Project Scope Developed near Jenner, Alberta, the Jenner Wind Farm project comprises 3 wind facilities totaling 303MW with 55 wind turbines.…