Location of Project  Jenner, Alberta, Canada Project Complete Year  2023 Client Potentia Renewables Project Scope Developed near Jenner, Alberta, the Jenner Wind Farm project comprises 3 wind facilities totaling 303MW with 55 wind turbines.…
Location of Project  Jenner, Alberta, Canada
Project Complete Year  2023
Client Potentia Renewables
Project Scope Developed near Jenner, Alberta, the Jenner Wind Farm project comprises 3 wind facilities totaling 303MW with 55 wind turbines. Development of this facility were broken up into 3 phases: 

Jenner Wind Farm 1 – is a 122.4MW generation facility consisting of 22 Enercon 5.5MW turbines, an underground collector line system, new turbine access roads, and road upgrades.  

Jenner Wind Farm 2 – is a 71.4MW generation facility consisting of 13 Enercon 5.5 MW turbines, an underground collector line system, new turbine access roads, and road upgrades.  

Jenner Wind Farm 3 – is a 109.2MW generation facility consisting of 20 Enercon 5.5 MW turbines, an underground collector line system, new turbine access roads, and road upgrades.  

All 3 projects share the same interconnection infrastructure connecting the facility to Alberta’s electricity grid.  

Rising Edge’s Scope of Work Engineering, procurement, construction (EPC) of 240/34.5kV collector substation, 100km of 34.5kV underground collector line network system, and 12km of 240kV transmission line supporting the interconnection of all 3 facilities.
Transmission Facility Operator AltaLink Management LP
System Operator Alberta Electric System Operator (AESO)
Voltage 240/34.5kV 
Service / Tags
  • Renewable Energy
  • Substation
  • Collector System
  • EPC
  • Control Building Fabrication
  • Transmission Line
  • Commissioning
  • Canada