| Location of Project | Cypress County, Alberta, Canada |
| Project Complete Year | Under Execution |
| Client Name | Northland Power |
| Project Scope | Jurassic BESS is a 80MW/160MWh battery energy storage project located in Cypress County, Alberta. The project involves installing 71 inverter/transformer stations, a battery energy storage system, an electrical collection system, access paths and the construction of a 240/34.5kV Project Substation to connect to the Alberta Electric System Operator (AESO). |
| Rising Edge’s Scope of Work | Executing the full engineering, procurement, installation, construction, checkout, commissioning, start-up, testing, training, and turnover to the owner of this BESS project – which consists of 39x Sungrow PowerTitan 2.0 containers for the BESS facility and the 240/34.5kV project substation. |
| Transmission Facility Operator | AltaLink Management LP |
| System Operator | Alberta Electric System Operator (AESO) |
| Technology | Sungrow PowerTitan 2.0 Containers |
| Capacity | 80MW / 160MWh |
| Voltage | 240/34.5kV |
| Service / Tags |
|
Jurassic BESS and Substation
Location of Project Cypress County, Alberta, Canada Project Complete Year Under Execution Client Name Northland Power Project Scope Jurassic BESS is a 80MW/160MWh battery energy storage project located in Cypress County,…