| Location of Project | Churchill County, Nevada, USA |
| Project Complete Year | 2025 |
| Client Name | Gridworks Energy |
| Project Scope | A 400MW, 4hr (1.6GWH) Battery Energy Storage System (BESS) project that is designed to store the increased renewable energy generation to meet state portfolio standards. |
| Rising Edge’s Scope of Work | Executed the construction of BESS containing 456x Tesla 2XL Megapacks. This included the yard fencing, megapack foundation and testing, MVT foundation installation and testing, underground conduit, low-voltage cabling, and site ground grid. |
| Technology | Tesla 2XL Megapacks |
| Capacity | 400MW / 1.6GWh |