Stirling Wind Farm Substation and Collector

Location of Project  Stirling, Alberta, Canada Project Complete Year  2023 Client Potentia Renewables Project Scope Stirling Wind Farm is a 120.4MW wind energy facility and includes a total of twenty-three…
Location of Project  Stirling, Alberta, Canada
Project Complete Year  2023
Client Potentia Renewables
Project Scope Stirling Wind Farm is a 120.4MW wind energy facility and includes a total of twenty-three (23) wind turbine generators (WTGs). Additionally, the facility includes an electrical collection system, access roads, and the construction of a new wind collector substation (“Red Coat”). The turbines are connected through a combination of 34.5 kilovolt (kV) above ground and underground collector lines that connect to the new Red Coat Substation.
Rising Edge’s Scope of Work Engineering, procurement, construction (EPC) of 138/34.5kV collector substation and 40km of 34.5kV underground collector system.
Transmission Facility Operator AltaLink Management LP
System Operator Alberta Electric System Operator (AESO)
Voltage 138/34.5kV 