| Location of Project | Winnifred, Alberta, Canada |
| Project Complete Year | 2024 |
| Client | Enerfin Energy Company of Canada |
| Project Scope | The Winnifred Wind Farm is located approximately 5.5km north of the hamlet of Whitla in southeastern Alberta, within the County of Forty Mile No. 8 and Cypress County. The Winnifred facility is a 122MW wind energy facility consisting of twenty-two (22) Enercon 5.56MW wind turbine generators (WTGs) interconnected via a 34.5kV medium voltage collector system. The project includes underground and collector circuits, access roads, temporary construction laydown areas, and the construction of the 138/34.5kV 1054S Holsom collector substation, which interconnects the facility to the Alberta Interconnected Electric System (AIES). The substation includes a main power transformer and five (5) collection feeders. |
| Rising Edge’s Scope of Work | Engineering, procurement, and construction (EPC) of 138/34.5kV collector substation and 44km of 34.5kV underground collector system. |
| Transmission Facility Operator | AltaLink Management LP |
| System Operator | Alberta Electric System Operator (AESO) |
| Voltage | 138/34.5kV |
| Service / Tags |
|
Winnifred Wind Farm Substation and Collector
Location of Project Winnifred, Alberta, Canada Project Complete Year 2024 Client Enerfin Energy Company of Canada Project Scope The Winnifred Wind Farm is located approximately 5.5km north of the hamlet…












